225 Wyman Street
Project Overview
Hancock Associates provided civil engineering services to assist with the filing for a Zoning Amendment to create an Overlay District at an office park in Waltham, MA. The Overlay District reduced the building property line setbacks and allowed for greater density. After the Zoning Amendment was approved, we provided a development analysis of the project site. With this information the client moved forward with the site development. The project included the demolition of the two existing office buildings and the construction of a new 500,000 sq. ft. office/lab space building with a 1,500-vehicle parking garage.
ADA Site Analysis, Design and Compliance
Construction Document Preparation
Due Diligence Site Investigations
Land Development Site Design
Land Planning
Notice of Intent (NOI)
Permitting Support
Regulatory Permitting Coordination
Sanitary Lift Station Design
Soil Erosion/Sediment Control Design
Stormwater Management System Analysis, Design and Post Construction Mapping
Stormwater Pollution Prevention Plan (SWPPP) Preparation and Inspection
Water and Wastewater Design