Forest River Park

Project Overview

Hancock Associates provided land surveying and civil engineering services to replace the existing pool, rehab an existing bathhouse, manage stormwater and restore the shoreline. This 110-year-old pool was draining water into Salem Harbor, dropping the water level by 6″ on a typical day. In the off season, water flowed into the pool making repairs nearly impossible.

Services
  • ADA Site Analysis, Design and Compliance
  • Construction Administration
  • Construction Document Preparation
  • Due Diligence Site Investigations
  • Erosion Control Design
  • Existing Conditions Survey
  • Infrastructure Design
  • Land Development Site Design
  • Municipal Support Services
  • Permitting Support
  • Roadway Design
  • Sanitary Sewer Design
  • Sewerage Lift Station Design
  • Stormwater Management System Analysis, Design and Post-Construction Monitoring
  • Stormwater Pollution Prevention Plan (SWPPP), Preparation and Inspection
  • Water and Wastewater Design