St. John’s Preparatory School

Project Overview

In 2012, St. John’s Preparatory School began carrying out their strategic plan for the future, known as Prep 20/20. As a long-time partner of the school, they called on Hancock Associates to assist in the planning and implementation of two key initiatives, a new $24.9 million, 88,000 sq. ft. Wellness Center and $22.3 million, 74,000 sq. ft. Brother Keefe Academic Center as well as tennis courts relocation, ballfield improvements, cemetery enhancements, solar field, etc.

Services
  • Abbreviated Notice of Resource Delineation (ANRAD)
  • As-Built Surveys
  • Boundary Surveys
  • Construction Staking
  • Easements
  • Erosion Control Design
  • Existing Conditions Survey
  • Land Planning
  • Notice of Intent (NOI)
  • Permitting Support
  • Sanitary Sewer Design
  • Site Design
  • Stormwater Management System Analysis, Design and Post-construction Monitoring
  • Stormwater Pollution Prevention Plan (SWPPP) Preparation and Inspection
  • Wetland Construction Observation
  • Wetland Surveys